Update on the Energy Savings Opportunity Scheme (ESOS)
Contents |
[edit] Energy Savings Opportunity Scheme amending regulations from 2024
ESOS is a mandatory energy assessment scheme for qualifying UK organisations (those defined as ‘large undertakings’) and administered by the Environment Agency (EA). New ESOS Amending Regulations have just been issued, which are set to become effective by the end of 2023.
[edit] ESOS Requirements and deadlines
Organisations that qualify for inclusion in ESOS must carry out ESOS assessments every four years. These audits - of energy use in buildings, processes and transport – should identify applicable, cost-effective measures to save energy and thus achieve cost/carbon savings. ESOS is now entering its third compliance period (‘phase 3’). Organisations that qualify for ESOS must meet the requirements of the new Amending Regulations and, for phase 3, must notify the EA by 5 June 2024 that they have complied with their ESOS obligations;
According to ECA Director of CSR Paul Reeve “Following requests from industry stakeholders, to help provide a sensible timeline for participants to meet the newly amended legislative requirements (and for assessors to carry out ESOS assessments) phase 3 participants have until 5 June 2024 to provide their notification of compliance – a six months extension from the previously expected (and now imminent) date of 5 December”.
As of 24 November 2023, the EA says an “updated online notification system is likely to be in place by the end of 2023”.
[edit] New Amending Regulations
The Energy Savings Opportunity Scheme Regulations 2014 were amended on 27 November 2023 by the Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (SI 1182) (the ESOS Amendment Regulations). These Amending Regulations introduce changes to ESOS that aim to make the scheme more effective. The new Regulations are at: www.legislation.gov.uk/uksi/2023/1182/note/made
EA guidance also shows/signposts to what is required to achieve and notify ESOS compliance at: www.gov.uk/guidance/energy-savings-opportunity-scheme-esos
[edit] Are you covered by ESOS?
ESOS applies to UK organisations (and their corporate groups) classed as ‘large undertakings’ on 31 December 2022. This means an organisation that either:
employs 250 or more people, or
has an annual turnover in excess of £44 million, and an annual balance sheet total in excess of £38 million.
This article appears on the ECA news and blog site aas "Update on the Energy Savings Opportunity Scheme (ESOS)" dated November 30, 2023.
--ECA
[edit] Related articles on Designing Buildings.
Featured articles and news
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.